Original AWS data-campus PPA tied to Susquehanna. Source states MW directly; no GW-to-MW conversion was made. The arrangement was later revised in June 2025.
Expanded PPA expected to transition the existing co-located load arrangement to a front-of-the-meter arrangement after transmission reconfigurations. Source states MW directly; no GW-to-MW conversion was made.
Generation capacity (GW)
Whether generation exists to power AI buildout; producer fleet scale.
“We own and operate approximately 10.7 gigawatts of power infrastructure in the United States, including 2.2 gigawatts of nuclear power and a significant dispatchable generation fleet.”
Owned And Operated Power Infrastructure · FY2025: 13.1 GW
“Talen is a leading independent power producer and energy infrastructure company dedicated to powering the future. We own and operate approximately 13.1 GW of power infrastructure in the United States, including 2.2 GW of nuclear power and a significant dispatchable fossil fleet.”
Owned And Operated Power Infrastructure · 2026-06-15: 15.6 GW
“Talen Energy (NASDAQ: TLN) is a leading independent power producer and energy infrastructure company dedicated to powering the future. We own and operate approximately 15.6 gigawatts of power infrastructure in the United States, including 2.2 gigawatts of nuclear power and a significant dispatchable fossil fleet.”
Owned And Operated Power Infrastructure · 2026-08-05: 15.7 GW
“Talen Energy (NASDAQ: TLN) is a leading independent power producer and energy infrastructure company dedicated to powering the future. We own and operate approximately 15.7 GW of power infrastructure in the United States, including 2.2 GW of nuclear power and a significant dispatchable fossil fleet.”
Current source layer
Current Source-Backed Data
No current-period source-backed data for this entity.
Source-backed timeline
Entity Signals Feed
No source-backed current-period signals in this feed.
Honest gaps
Excluded and Undisclosed Items
Not disclosed
0
Rejected
0
Unverifiable
0
Rejected items exist in the audited workflow when source, quote, or period checks fail; they are excluded from every displayed chart and table.